Logistics & Manufacturing

Time tracking for logistics and manufacturing

Multi-site management, 24/7 shifts and continuous operation control

500+
Employees manageable in one system
Multi
Unlimited sites
24/7
Continuous operation

Challenges in Logistics & Manufacturing

Common problems that Emplyx solves

01

Three-shift rotating rotas built by hand

Antonio coordinates a warehouse running three shifts. Every month he wrestles with a spreadsheet to fit morning, afternoon and night into a 6x2 pattern, then emails the whole floor plan. He almost always lets an overlap slip through — two people in one spot, nobody in another.

Building rotating patterns by hand produces gaps and duplicates that nobody catches until the shift is already underway. 'What shift am I on this week?' is every Monday's first question.

With Emplyx, rotating patterns are generated automatically, several weeks at a time, with overlaps detected and every post confirmed as covered. Antonio's three-shift rota is built in minutes with not a single gap.

02

A sick call at five to six that throws off the whole month

An operator called at 5:50 to say he wouldn't make the 6:00 shift. The supervisor patched it with overtime, but the problem didn't end there: filling that gap knocked the rotating pattern for the following weeks out of line.

In a rotating rota, a last-minute absence isn't just one uncovered shift. It's a domino effect across the entire month, and reworking it by hand takes hours.

With Emplyx, when the absence is reported the system updates the rota and proposes viable replacements, matching availability, profile and rest requirements. Someone's missing at six, and by one minute past there's already a suggested replacement — without the whole monthly rotation collapsing.

03

Three hundred clock-ins at once during the shift change

From 2026, time recording on the shop floor must be digital, traceable and remotely accessible to the Labour Inspectorate. In a warehouse with hundreds of operators, every shift change means hundreds of clock-ins in a few minutes, and a single time clock grinds to a halt.

Paper time sheets no longer meet the standard, and one reader can't handle the peak at handover.

With Emplyx, clock-in is multi-method — kiosk or tablet with PIN, QR, NFC, mobile app — and handles the surge of clock-ins at shift change without breaking. The record is traceable and exportable, inspection-proof even when three hundred people are clocking in at once.

04

Absenteeism eating into production targets

The plant manager at a factory kept seeing output fall on Mondays and Fridays without a clear explanation. What he was looking at was chronic absenteeism: a 5% absence rate can cut output by 15–20%, and each absent worker costs over 2,600 dollars a year.

The problem isn't the individual absences — it's not seeing them as a pattern. Inexperienced replacements brought in at short notice also drive up defect rates.

With Emplyx, there are absenteeism metrics by shift, by day and by person that surface patterns and allow reinforcements to be pre-assigned where they keep recurring. Absenteeism stops being something you suffer blind and starts being something you anticipate.

05

Overstaffed on one shift, stretched thin on another

At a logistics platform, some shifts had people standing around while others were swamped, and the agency and overtime bill kept climbing month after month with nobody quite sure why.

Without matching headcount to actual demand by time slot, you overpay on one side and accumulate overtime and agency costs on the other. The cost spirals in both directions at once.

With Emplyx, coverage is sized slot by slot, the rota cost is visible before it's published, and alerts fire when a shift is over- or under-resourced. The cost of a shift is known before the payslip, not after.

06

Chaining a night shift straight into a morning shift with nothing flagging it

The law requires twelve hours of rest between shifts and caps overtime at eighty hours a year. In a rotating rota it's easy for an operator to finish a night shift at ten and start a morning shift at six the next day without anyone checking. Fines for this reach 7,500 euros.

The error isn't visible when you're building the rota, and almost nobody tracks each person's overtime counter on a daily basis.

With Emplyx, the system blocks or flags any assignment that breaks the twelve-hour rest requirement, and tracks each person's overtime counter with an alert as they approach the limit. The software won't let you chain a night into a morning — the same way the law won't either.

07

Nobody keeping track of which licences are about to expire

Forklift licences, health and safety certifications and overhead crane qualifications all expire, and in many warehouses those dates live on a loose sheet nobody reviews. Assigning someone with an expired licence is a serious legal and safety risk.

The usual way to find out about an expiry is late: in an inspection, or worse, in an accident.

With Emplyx, every operator has a profile with their certifications and expiry dates, alerts fire ahead of renewal deadlines, and if a licence isn't current the system blocks the assignment. Nobody gets on a forklift with an expired licence — the system simply won't allow it.

08

Doubling the headcount for peak season without doubling the chaos

During e-commerce peak season, order volumes at a logistics centre can rise between 30% and 400%. Overnight you have to shift to three turns and mix permanent staff with temps. Over-resourcing burns budget; under-resourcing creates bottlenecks.

Scaling blind — mass onboarding done in a rush with no coordination between permanent and temporary staff — turns the campaign into a month of constant improvisation.

With Emplyx, rotas are built on a core layer with a flexible layer on top, partial shifts for predictable spikes and fast mass onboarding for seasonal workers. You double the headcount for peak season without doubling the chaos.

09

The night shift concentrating sick days, fatigue and accidents

At one plant, the night shift accumulated the most sick days and was where the most defects and errors appeared in the small hours. That wasn't a coincidence: fatigue multiplies mistakes by 35%, and stringing consecutive nights together spikes accident rates by 40%.

Without limits on consecutive night sequences, the night shift burns out, and with it absenteeism and turnover on that shift climb.

With Emplyx, night sequences are capped at three or four nights with recovery days in between, nights are distributed fairly, and the rota is published with two weeks' notice. The night shift stops being the one that burns out.

10

Night shift premiums calculated by guesswork

It's a common mistake: confusing a shift's total hours with its actual night hours. A shift from 20:00 to 04:00 has eight hours, but only six of them fall inside the legal night window of 22:00 to 06:00. Calculating this on historical rules ends in disputes over the night premium.

With Emplyx, the system calculates exactly which hours fall within the 22:00–06:00 window based on each person's actual clock-in and applies the agreement's percentage. The night premium is paid on real hours, with no disputes.

11

WhatsApp as the official rota system

In many logistics centres, shift changes are announced in a WhatsApp group that effectively operates as the official system. Notifications don't reach everyone, replacements aren't logged in any rota, and 'I never got the message' is impossible to disprove.

With Emplyx, the rota is a single centralised source, accessible from any phone, with change notifications and read confirmations. The rota stops living in a WhatsApp group.

12

When only Juan knows how to run that post

A warehouse runs in teams and lines, each with specific roles. The supervisor kept everything in his head, and it showed the day a key person was missing: 'only Juan knows that post,' and the line stopped and waited for Juan.

Without a skills matrix, the supervisor improvises on the spot who to move, and any absence of a specific profile can halt an entire line.

With Emplyx, assignments are made by team or crew and by role, with a cross-skilling matrix that only suggests replacements from those who are qualified. Assignment is by crew and role, not by a single name in a box.

13

Approved holidays that leave the night shift uncovered

At a factory, holidays were approved in one place and the rota was built in another. August arrived and the night shift lost its minimum coverage, because nobody had ever cross-checked the approved holidays against the rotating pattern.

Approving absences without seeing them on the rota creates gaps that surface too late and force last-minute manual reworks.

With Emplyx, holidays, leave and sick days are integrated into the rota, and when an absence is approved the system flags if it breaks minimum coverage on any shift. Holidays get approved already knowing whether they'll leave the night shift uncovered.

14

Comparing shifts and sites on gut feel rather than data

The plant manager suspected the night shift was underperforming but couldn't tell whether it was fatigue or headcount. Across the company, with several warehouses, each site operated as an island and the manual reports never quite added up.

Without comparable data, decisions about shifts and sites are made on instinct, and hand-built reports arrive late and with errors.

With Emplyx, a single dashboard brings together actual hours, absenteeism and coverage by shift and by site, all comparable. Shifts and sites are compared with data, not hunches.

Guaranteed legal compliance

Everything you need to stay up to date with regulations

  • Time records with kiosk mode
  • Full audit trail of night shifts
  • Exportable reports for payroll
  • Multi-site audit capability

What our customers say

We manage three warehouses and two shifts. Emplyx gives us consolidated coverage and real-time alerts when a line is short-staffed.

Carlos Vega

Operations Director · LogiGroup Iberia

Labour inspections are no longer stressful. Every record is digital, signed and exportable in seconds.

Ana Peiro

HR Manager · Distribución Central

Night-shift rotation used to be a headache. Now Emplyx publishes the rota automatically and staff confirm from their phones.

Marcos Gil

Plant Manager · Planta Industrial Sur

Frequently asked questions

Can Emplyx handle continuous 24/7 operations?+

Yes. You can plan night shifts, rotating schedules and continuous coverage across multiple sites, with real-time alerts when coverage gaps arise.

How does multi-site management work?+

Emplyx gives you a unified view across all your warehouses or factories, with per-location permissions, consolidated reports and granular manager access.

Can workers clock in without a smartphone?+

Yes. PIN or QR kiosks can be installed at site entrances or production lines.

How is overtime tracked in industrial environments?+

Emplyx compares planned shifts with actual clock-in data and flags overtime in real time, letting supervisors approve compensation immediately.

Is it compliant with Spanish labour law for industry?+

Yes. Records are immutable, with full audit trails and standard exports for labour inspections.

Can shift patterns be customised per team or line?+

Yes. Each team or production line can have its own shift pattern, rest rules and coverage requirements.

Get started today

Join hundreds of Logistics & Manufacturing companies already using Emplyx